Student Work

Sustainable Design of Belmont Street/Route 9 Bridge

公开

可下载的内容

open in viewer

Based on inspection reports provided by MassHighway, the Belmont Street/Route 9 Bridge has three bridge components deemed deficient . The deck slab, girders, and columns were re-designed using AASHTO specifications and LRFD design. Additionally, sustainable bridge design aspects were examined including alternative building materials, maintenance protection, stormwater management, and transportation and urban planning. Lastly, a life-cycle cost analysis considering the re-designed bridge components and maintenance was conducted and a sustainable bridge guideline for future bridge design projects was created.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
贡献者
Publisher
Identifier
  • E-project-030509-190349
Advisor
Year
  • 2009
Date created
  • 2009-03-05
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/1c18dh36j