Student Work
Auburn Wind Project
PubblicoContenuto scaricabile
open in viewerThis Major Qualifying Project (MQP) presents recommendations for the installation and site design of two 1.5 mega-watt wind turbines on Granger Cliffs in Auburn, Massachusetts. This project, which was completed in collaboration with a group completing an Interactive Qualifying Project (IQP), addresses the following topics and issues: site selection, zoning, turbine selection, turbine cost estimate and payback period, access road design, environmental issues, social concerns and scheduling and delivery details. The project's outcome is a feasible wind farm site design and cost analysis for the Town of Auburn, Massachusetts.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-042810-230253
- Advisor
- Year
- 2010
- Date created
- 2010-04-28
- luogo
- Auburn
- Resource type
- Major
- Rights statement
- Ultima modifica
- 2021-01-07
Relazioni
- In Collection:
Articoli
Elementi
Thumbnail | Titolo | Visibilità | Embargo Release Date | Azioni |
---|---|---|---|---|
Auburn_Wind_Project_MQP_4-29.pdf | Pubblico | Scaricare |
Permanent link to this page: https://digital.wpi.edu/show/1831cm70b