Maintenance and Expansion Evaluation of the Panama Canal
PúblicoConteúdo disponível para baixar
open in viewerThe Panama Canal Authority (ACP) is currently undergoing maintenance and expansion projects on the Panama Canal. This project includes progress analyses and design elements related to the Borinquen Dam 1E and the Pacific canal entrance. The goals of this project is to achieve four design oriented objectives including: 1) recommendations for the improvement of the dredging operations at the Pacific canal entrance; 2) the design process for producing as-built grout profile drawings along Dam 1E; 3) the compaction and testing specifications for the clay core of Dam 1E and; 4) a progress and cost analysis including recommendations for Dam 1E. Results from this paper provided the ACP with information and recommendations to improve the functionality of several operations.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-012815-145810
- Advisor
- Year
- 2014
- Center
- Sponsor
- Date created
- 2014-01-28
- Localização
- Panama City
- Resource type
- Major
- Rights statement
Relações
- Em Collection:
Itens
Permanent link to this page: https://digital.wpi.edu/show/0v8381928