Skip to Content
Toggle navigation
首页
Browse
Browse by Collection
Browse by Project Center
Browse Exhibits
About
About Us
Help
登录
Explore, Discover, Share
转到
Advanced search
搜索条件
清除筛选
筛选:
关键词
Scheduling
删除限定条件 关键词: Scheduling
1
-
6
共
6
按 relevance 排序
relevance
date uploaded ▼
date uploaded ▲
date modified ▼
date modified ▲
每页显示结果数
10 每页
10
每页
20
每页
50
每页
100
每页
以如下方式察看搜索结果:
列表
图片式展示
砌体式展示
幻灯式展示
Download search results to .CSV file
搜索结果
Add to Category
Remove From Category
Extending Course Planner for Broader Academic Coverage
关键词:
Scheduling
,
Mathematical Optimization
,
Course Selection
,
Student Trajectories
, and
Linear Programming
创造者:
Kimball, Jennifer
and
Suyer, Matthew
Advisor:
Trapp, Andrew C
出版者:
Worcester Polytechnic Institute
创建日期:
2024-03-21
Resource Type:
Major Qualifying Project
Improving Machine Utilization and Scheduling at Sjogren Industries
关键词:
CNC Machining
,
AI
,
Continuous Improvement
,
Scheduling
,
Optimization
, and
Manufacturing
创造者:
Sniezek, Henry
,
McGonigle, Conor
, and
Varela, Christian
Advisor:
Konrad, Renata
出版者:
Worcester Polytechnic Institute
创建日期:
2024-03-22
Resource Type:
Major Qualifying Project
Analysis of Agricultural Development Opportunities in Buxton, Guyana
关键词:
Cost Benefit Analysis
,
Axiomatic Design
,
Guyana
,
Gantt Chart
,
Scheduling
, and
Planning
创造者:
Modine, Michael
,
Barry, Abdoul
,
Lambert, Ralph
, and
Sseruwagi, Benjamin
Advisor:
Zephyrin, Kristophe
,
Towner, Walter Thomas
, and
Walker, Harold W.
出版者:
Worcester Polytechnic Institute
创建日期:
2023-03-20
Resource Type:
Major Qualifying Project
Guiding Course Selection via Degree Evaluation Optimization
关键词:
Degree audit
,
Integer linear programming
,
Mathematical optimization
,
Course selection
,
Assignment problems
, and
Scheduling
创造者:
Fletcher, Lindsey
Advisor:
Trapp, Andrew C
出版者:
Worcester Polytechnic Institute
创建日期:
2023-03-19
Resource Type:
Major Qualifying Project
Kaven Hall Renovation
关键词:
Scheduling
,
Construction
,
Construction Industry
,
Construction Project Management (CPM)
, and
Renovation
创造者:
Reis, Igor
and
Yip, Joe-Yee
Advisor:
Rosewitz, Jessica A.
出版者:
Worcester Polytechnic Institute
创建日期:
2022-04-28
Resource Type:
Major Qualifying Project
Benefits of Building Information Modeling for Construction Managers and BIM Based Scheduling
关键词:
Scheduling
,
BIM
, and
Building Information Modeling
创造者:
Hergunsel, Mehmet Fuat
Advisor:
Salazar, Guillermo F.
出版者:
Worcester Polytechnic Institute
创建日期:
2011-04-20
Resource Type:
Thesis
Degree:
MS
Unit (Department):
Civil & Environmental Engineering
Toggle facets
限定搜索
Collections
Major Qualifying Projects
5
Masters Theses
1
Year
Year range begin
–
Year range end
Current results range from
2011
to
2024
View distribution
创造者
Barry, Abdoul
1
Fletcher, Lindsey
1
Hergunsel, Mehmet Fuat
1
Kimball, Jennifer
1
Lambert, Ralph
1
更多
创造者s
»
Advisor
Konrad, Renata
1
Rosewitz, Jessica A.
1
Salazar, Guillermo F.
1
Towner, Walter Thomas
1
Trapp, Andrew C
2
更多
Advisors
»
Contributor
Albano, Leonard D.
1
Salazar, Guillermo F.
1
Major
Civil Engineering
1
Data Science
1
Industrial Engineering
2
Management Engineering
1
Unit (Department)
Civil & Environmental Engineering
1
出版者
Worcester Polytechnic Institute
6
学科
Community
1
Culture
1
Environment
1
Food
1
Industry
1
更多
学科s
»
UN SDG
4 - Quality Education
1
9 - Industry, Innovation and Infrastructure
1
11 - Sustainable Cities and Communities
1
资源类型
Major Qualifying Project
5
Thesis
1