Search Constraints
Filtering by:
Advisor
Salazar, Guillermo F.
Remove constraint Advisor: Salazar, Guillermo F.
« Previous |
1 - 50 of 209
|
Next »
Number of results to display per page
Search Results
Select an image to start the slideshow
WPI parking structure design
1 of 50
Worcester Vocational High School construction
2 of 50
Worcester Vocational High School - Part III
3 of 50
Worcester Vocational High School -- Part II
4 of 50
Worcester Trial Courthouse
5 of 50
Worcester Polytechnic Institute's Campus Center -- a study in Internet project management
6 of 50
Value engineering -- Bullard Street Elementary School
7 of 50

Tracking of steel framework on the Worcester Trial Courthouse
8 of 50
The Worcester Trial Courthouse
9 of 50
Prudential Estates -- a Town of Northborough subdivision design
10 of 50
Project management -- Worcester Vocational High School
11 of 50
Preliminary designs for future improvements to the Heifer International Overlook Farm
12 of 50
Preliminary design cost for college dormitories
13 of 50
New design and rehabilitation of the Miller Street Bridge over the Chicopee River
14 of 50
International use of the building information model
15 of 50
Hilton Garden Inn
16 of 50
Evaluating the construction of the Bartlett Center
17 of 50
Economic model for evaluation of tunneling infrastructure of the Mexico City subway system (Metro)
18 of 50
Earned value analysis and alternative steel design for WPI Life Science and Bioengineering Research Center at Gateway Park
19 of 50
Douglas track and field project
20 of 50
Development of residential estate in Lagos, Nigeria
21 of 50
Design of a water distribution line in the town of Grafton, Massachusetts
22 of 50
Construction of the Worcester Trial Courthouse
23 of 50
Construction of the Worcester Hilton Garden Inn
24 of 50
Computer-based project management :Bullard Street Elementary School
25 of 50
Case study: alternative project delivery via fast-tracking
26 of 50
Analysis of the proposed renovations to Perrault Hall
27 of 50
Analysis of the construction of the Zottoli School
28 of 50
Analysis of project management -- WPI Campus Center Study
29 of 50
Alternative long span structural design for the WPI Campus Center
30 of 50
A Comparison of Traditional Construction Estimating Practices to BIM-Based Estimating Process for Early Design
31 of 50
The Design and Construction of the Wachusett Dam: Contractor’s Perspective and Contemporary Considerations
32 of 50
The Design and Construction of the Wachusett Dam: Owner Perspective and Contemporary Considerations
33 of 50
Promoting Sustainability Through Online Platforms
34 of 50
Marketing an Artisan Community on the Island of Møn
35 of 50
Island Life
36 of 50
Growing a Collaborative Online Community
37 of 50
Circular Economy in Small Companies Within Amager
38 of 50
A Sustainable Business Model for Urban Natural
39 of 50
Renovation of Alumni Gymnasium
40 of 50
A Construction Project Management Analysis of Foisie Innovation Studio
41 of 50
WORCESTER POLYTECHNIC INSTITUTE: A REDESIGN OF WPI’S NEW RESIDENCE HALL USING REINFORCED CONCRETE
42 of 50
A REDESIGN OF WPI''S NEW RESIDENCE HALL USING REINFORCED CONCRETE
43 of 50
A Starting Guide for Campus Sustainability
44 of 50
Alternative Gravity Load Resisting System Design for Clark University's Alumni & Student Engagement Center
45 of 50
Alternative Gravity Load Resisting System Design for Clark University's Alumni & Student Engagement Center
46 of 50
An Energy Analysis of the Foisie Innovation Studio
47 of 50
An Energy Analysis of the Foisie Innovation Studio
48 of 50
Boat House Design & Construction
49 of 50
CitySquare Underground Parking Garage
50 of 50