Search Constraints
Filtering by:
Advisor
Salazar, Guillermo F.
Remove constraint Advisor: Salazar, Guillermo F.
Unit
Civil & Environmental Engineering
Remove constraint Unit: Civil & Environmental Engineering
« Previous |
1 - 20 of 23
|
Next »
Number of results to display per page
Search Results
Select an image to start the slideshow
Feasibility of the SIMSUPER Simulation Model in the Renovation of Building Projects
1 of 20
Value Engineering for Small Transportation Projects
2 of 20
Assessing the Parametric Building Model Capabilities in Minimizing Change Orders
3 of 20
Strategic Issues in Lean Construction and the Higher Education Construction Market Sector
4 of 20
Design-Build in the Commonwealth of Massachusetts
5 of 20
Current Issues Surrounding the Quality of Construction Documents
6 of 20
Integration of 3 dimensional parametric building model with geographic information systems in educational facilities planning and management
7 of 20
Development of a Framework for Preliminary Risk Analysis in Transportation Projects
8 of 20
Review of Current Estimating Capabilities of the 3d Building Information Model Software to Support Design for Production/Construction
9 of 20
The Building Information Model in Facilities Management
10 of 20
Feasibility of Green Building at WPI
11 of 20
A formal model for measuring the different levels of IT-based Design and Construction Integration (ITDCI) in colleges and universities
12 of 20
Feasibility Analysis of BIM Based Information System for Facility Management at WPI
13 of 20
Life Cycle Cost Analysis Framework of Green Features in Buildings
14 of 20
Benefits of Building Information Modeling for Construction Managers and BIM Based Scheduling
15 of 20
Building Information Modeling (BIM): Site-Building Interoperability Methods
16 of 20
Application of Reliability-Centered Maintenance in Facility Management
17 of 20
A Comprehensive Method for the Selection of Sustainable Materials for Building Construction
18 of 20
Use of Building Information Modeling technology in the integration of the handover process and facilities management
19 of 20
The Use of Axiomatic Design in the Development of an Integrated, BIM Based Design Process
20 of 20