Search Constraints
Search Results
Select an image to start the slideshow
A Comparison Of Earned Value Analysis Method To Earned Schedule As Of Time Duration
1 of 10
Building Information Modeling in Support of Space Planning and Renovations in Colleges and Universities
2 of 10
Developing Building Information Modeling (BIM) Guidelines for Campus Planning and Facilities Management at Worcester Polytechnic Institute (WPI)
3 of 10
The Use of Axiomatic Design in the Development of an Integrated, BIM Based Design Process
4 of 10
Use of Building Information Modeling technology in the integration of the handover process and facilities management
5 of 10
A Comprehensive Method for the Selection of Sustainable Materials for Building Construction
6 of 10
Application of Reliability-Centered Maintenance in Facility Management
7 of 10
Building Information Modeling (BIM): Site-Building Interoperability Methods
8 of 10
Benefits of Building Information Modeling for Construction Managers and BIM Based Scheduling
9 of 10
Life Cycle Cost Analysis Framework of Green Features in Buildings
10 of 10