Search Constraints
Filtering by:
Advisor
Johnson, Sharon A.
Remove constraint Advisor: Johnson, Sharon A.
Major
Industrial Engineering
Remove constraint Major: Industrial Engineering
Collections
Major Qualifying Projects
Remove constraint Collections: Major Qualifying Projects
1 - 37 of 37
Number of results to display per page
Search Results
Select an image to start the slideshow
Stockroom procedures at Teradyne, Inc
1 of 37
RPS, Inc. -- switcher simulation
2 of 37
RPS, Inc. -- parking analysis
3 of 37
Reducing supply and shipment costs for fulfillment centers at Staples, Inc
4 of 37
Lean manufacturing cell development at Teradyne
5 of 37
Inventory management of fulfillment centers at Staples
6 of 37
FC productivity at Staples
7 of 37
Evaluation of the method for release from manufacturing of the Polaroid PolaProof inksheets
8 of 37
Coppus Engineering I -- cycle time reduction of Jectair® product line
9 of 37
Analysis of inventory control at Teradyne Connector Systems
10 of 37
IE MQP Group Hospital
11 of 37
Rural Health Diabetes Model
12 of 37
Analyzing Menstrual Product Consumption on WPI’s Campus to Provide Future Product Access Recommendations
13 of 37
Improving On-Time Delivery at Madera y Metal
14 of 37
Bus Transportation Analysis for a Changed Start Time in the Millbury Public Schools
15 of 37
Analyzing the Cost of Norton Saint-Gobain Super Abrasive Grinding Wheels
16 of 37
ANALYSIS OF TRANSPORTATION SERVICES FOR A PACE PROGRAM
17 of 37
Expanding Operations for Battery Steele Brewing
18 of 37
HPT Blades Rework Improvement Design and Implementation
19 of 37
Implementing Lean Process Improvement in the Sterile Processing Department at the Academic Medical Center
20 of 37
Implementing Lean Solutions at the Front Desk of Hahnemann Family Health Center
21 of 37
Improve Delivery Efficiency and Effectiveness
22 of 37
Improving Cross-Program Collaboration, File Storage, and Test Procedure at iRobot Corporation
23 of 37
Increasing the Dental Department Capacity in the Family Health Center of Worcester
24 of 37
Lean Implementation at St. Vincent Hospital
25 of 37
Long Term Care Improvement at Oriol Health Care
26 of 37
Long Term Care Improvement at Oriol Health Care
27 of 37
Managing Lateness to Improve Process Flow in Primary Care
28 of 37
Material Handling Guidelines to Support Lean Cells in the Bose Production System
29 of 37
Process Improvement and Lean Implementation at Saint-Gobain
30 of 37
Process Improvement and the Advantages of Simulation
31 of 37
Process Improvement at St. Vincent Hospital
32 of 37
The Final Line
33 of 37
The Standardized Monolithic Repair Router
34 of 37
VA Laundry and Linen Distribution Optimization
35 of 37
VA Linen Distribution Optimization
36 of 37
WPI Combined Heat and Power Feasibility
37 of 37